Shenzhen TYPMAR Wind Energy Technology Co.,Ltd  

Gold Index: 8040

You are here: home  > 3000W Maglev Wind Turbine Tower Foundation , Magnetic Windmill installation

3000W Maglev Wind Turbine Tower Foundation , Magnetic Windmill installation 

Place of Origin: Zhejiang, China (Mainland) 
inquire
Add to Basket Add to My Favorites
HiSupplier Escrow
Share |

Product Detail

Model No.: CXF-3000W

 
3000W Maglev Wind Turbine Tower Foundation , Magnetic Windmill installation
 
<span sty

 

3000W Maglev Wind Turbine Tower Foundation , Magnetic Windmill installation


 
1, Foundation Guide for CXF-3000W

 

Before construction the foundation for the CXF-3000W system, read these instructions carefully. These instructions are only intend to be guide for concrete foundation on solid soils or suitable roof infrastructure. Please contact your local civil or structure engineer for more information.

 
2, Ground Foundation

 

The foundation should be prepared as 3.24 cubic meter in dimension (1000m/mX1800m/mX1800m/m) depth, dug into the soil. Please follow the diagram, make a template of the mast bottom. This template will be temporarily used for holding four Anchor Bolts vertically and electric conduit (if applied) in the precise position while pouring concrete into the foundation hole later.  

 

Insert rebar into the foundation hole and jack up to approximately the right height. Prepare the electrical conduit in place before pouring the concrete if a hidden wiring method is applied.  Attach the M16 screwed rods with nuts provided to the template. Make sure there have at least 100mm of thread above the concrete level. Fix the conduit through the center of the template and push the end of other of conduit to the side of foundation (If applied).

 

Add the concrete, using a vibration poker to remove air voids from the pour. It is very important to make sure that the all four rods are hooked under the rebar. Once the concrete is all poured, make sure that the template has no air voids directly underneath. More importantly, make sure the template is leveled off.

Next, clear excess concrete from above template and use a suitable cover to prevent the foundation from rain. Wait until the concrete has set complete before removing the template (It will take at least for one week).  Just remember, a solid with perfect leveled foundation is one of the key factors to achieve the success of installation.

 

 

 



 

bigPhoto
 Mr. Juan

Tel: 86-755-33872751
Contact to this supplier

Related Search

Find more related products in following catalogs on Hisupplier.com

Related Products

Company Info

Shenzhen TYPMAR Wind Energy Technology Co.,Ltd [China (Mainland)]


Business Type:Manufacturer
City: Shenzhen
Province/State: Guangdong
Country/Region: China (Mainland)

You May Like:

Product (167)